Doble Engineering explains some asset-management tools for critical electrical systems (PSDtv)

Date
06/17/2014

 PDF

In this episode of PSDtv Doble Engineering explains some of their asset-management tools for large critical electrical systems for Power Systems Design. Doble offers a complete line of partial discharge (PD) testing solutions. A thorough condition-based maintenance program should include a selection of equipment for the detection of partial discharge in high voltage apparatus. Following the initial detection of PD, the results can be further verified by high precision off-line techniques and appropriate corrective action taken.

Doble Engineering

RELATED